Technology & Equipment
A network that is documented, labelled and boring
Structured cabling, tested outlets and Wi-Fi planned for the building — so adding a device is a five-minute job instead of an afternoon of tracing wires.
What this covers
- Cat6/Cat6A structured cabling, terminated, tested and labelled
- Comms rack, patch panel and cable management installation
- Wi-Fi survey, access point placement and coverage testing
- Switch, router and firewall installation and configuration
- Fibre and inter-building links
- Point of sale, printer, camera and VoIP connectivity
- Remediation of unlabelled, overloaded or failing existing cabling
Common problems
What we usually get called about
If one of these sounds familiar, it is a job we do regularly.
“Wi-Fi is fine at the desk and useless everywhere else.”
How we handle it
We survey the building, place access points against real signal measurements and cable them properly instead of daisy-chaining extenders.
“The comms cupboard is an unlabelled nest of cable.”
How we handle it
We re-terminate onto a patch panel, label both ends and hand over a port schedule so future changes take minutes.
“POS or cameras drop off the network intermittently.”
How we handle it
We test each run to standard, replace failing terminations and separate the traffic that should not be sharing a link.
Our process
How a networking & cabling job runs
Step 1
Requirements & survey
We map outlets, devices and coverage needs across the building.
Step 2
Cabling design
Routes, outlet counts and rack layout agreed and quoted.
Step 3
Install & test
Cable is run, terminated and certified; access points placed and coverage verified.
Step 4
Documentation
You receive a labelled port schedule and network diagram.
Questions
Networking & Cabling — frequently asked
Straight answers, including the ones that might talk you out of the job.
Is cabling still worth it when Wi-Fi exists?
For anything fixed — POS, printers, cameras, desktops, access points themselves — yes. Cable is what makes the Wi-Fi reliable; it carries the access points back to the switch.
Do you test and certify the cabling?
Every run is tested and the results form part of the handover documentation, along with the labelled port schedule.
Can you work around our business hours?
Yes. Cabling in occupied offices, shops and hotels is usually staged after hours or area by area to avoid downtime.
Related
Often needed alongside this
Jobs like yours usually involve one or two of these as well.
CCTV & Access Control
Camera systems, alarms and access control specified for real coverage and set up so you can actually retrieve the footage.
Learn moreElectronic & Precision Equipment Repair
Diagnosis and board-level repair of computers, POS, and precision electronic equipment — assessed honestly against replacement cost.
Learn moreElectrical Installation & Wiring
Complete wiring for new builds, extensions and fit-outs — designed for the load you actually run, installed to code and documented.
Learn moreNeed networking & cabling? Tell us the details.
Describe the job in the form and we will reply within one business day. If it is an emergency, mark it as one and we will prioritise it.
